Bentley Motors Kitchen Ventilation

Client: Bentley Motors Situation: Our client on this project was approached by Bentley Motors to supply and fit a new staff catering facility from the ground up; in a new, semiportable, external unit. HVAC became involved when the facility needed ventilation for a full cooking suite for hot food. The servery/dining area also needed air […]

The Tabernacle Kitchen Extract Unit Upgrade

Client: The Royal Borough of Kensington & Chelsea. Situation: The Tabernacle had received complaints from local residents regarding the noise and odour from the existing kitchen ventilation system. HVAC was commissioned by The Royal Borough of Kensington & Chelsea to review the existing system and to design a solution. After the initial dilapidation report HVAC […]

JLP Kingston Espresso Bar AHU

Client: John Lewis Partnership. Situation: HVAC was commissioned by John Lewis Partnership to carry out the replacement of an old roof mounted air handling unit and associated controls at its Kingston Store because the existing system was beyond its useful life and contained r22 refrigerant. After a review of the current usage, HVAC were engaged […]

Monmouth School Full Kitchen Vent System with Canopy Ground Support Frame

Client Stangard Design Solutions Situation Our client, needed to fit-out a catering facility within a temporary School building. The structure was not sufficiently strong to support the entire weight of the canopy and ductwork from the structural soffit. Stangard also required a full ventilation system to integrate with the space restrictions imposed by the design […]

Eden Boys’ School Single-Sided Island Canopy & Services Distribution Unit

Client Stangard Design Solutions Situation As a regular client, Stangard contacted HVAC Kitchen Ventilation to provide a canopy & Services Distribution Unit for one of a series of projects they work on. The canopy was to be a single-sided island type with a matching and integrated Services Distribution Unit (SDU). Care had to be taken […]

John Lewis, MK Compactor Steelwork

Situation With a large increase in the production of cardboard for reclaim in the Magna Park Distribution Centre, HVAC were contacted to design a solution which would increase not only the capacity of the compactor , but allow production to continue during compacting cycle time. Maintenance was also a key factor for any new solution […]

Waitrose Newbury

Situation Waitrose Newbury is installed with a sprinkler system, serviced by a sprinkler tank pit to the side of the building. Following a Health & Safety audit soon after being built, the method of access was instructed to be made safer and that the pit should be covered to prevent un –authorised access and weather […]

Waitrose Bath

Situation Due to the success of the new extended store in Bath, HVAC were appointed to provide a design and build solution for additional cooling to the new entrance food hall area providing a new customer snacking area and fast lunchtime offer. HVAC were principal contractor in delivering a multi-service solution. Download case study PDF […]

Jamaica Inn

Situation: When the proprietor of the famed Jamaica Inn (at Bolventor, Cornwall) decided to change and expand the menu offering for his clientele and to provide an exclusive wedding venue, HVAC were approached through the catering specialist, to design and install a kitchen ventilation system. There was a strict budget and tight deadlines to meet but with its expertise in full kitchen ventilation systems, HVAC were […]

Prodrive, Banbury

Situation: Prodrive of Banbury planned for a staff café in their new state of the art premises adjacent to the M40 at Banbury. Due to the location of the building and the Landlord’s requirements, the kitchen discharge point was critical to gaining permission to go ahead with the project. In particular, the discharge grille had to be as unobtrusive as possible, match […]

keep looking »

    You need to add some widgets to this sidebar

A few companies we work with...